Concrete is a common subfloor material and in general it s easy to prepare for a luxury vinyl flooring installation project.
Do i need a subfloor for luxury vinyl plank concrete.
Vinyl click tile is usually very thin.
Do not line up the second layer with joints in the first layer.
However some people prefer to add another thin layer of subflooring between the concrete and vinyl.
So technically if you are installing vinyl plank flooring onto concrete you already have a subfloor.
Do you need underlayment for those.
Newly poured concrete off gases water vapor and typically needs from 120 to 150 days to dry out before it s ready to accept flooring according to milliken company.
In most cases as long as the old vinyl surface is flat you don t need to do anything more for this type of underlayment.
We are looking at a click vinyl plank flooring for our basement floor.
If you ve chosen luxury vinyl plank flooring as a replacement for your current flooring you ve made a very smart choice.
One of the most popular products on the market are easy to install click and lock vinyl plank tiles.
This additional layer can improve insulation and should make your vinyl plank flooring warmer and less resonant.
For most subfloors you will need to add an extra layer of wood.
What about for click and lock vinyl tiles.
Pressure sensitive adhesive is already on the bottom of the plank and bonds to the subfloor when the plank is pressed into place.
Vinyl plank flooring is water resistant and if it has a wpc core it s waterproof so it won t be damaged by the off gassing.
Concrete and wood subfloors each have their own subfloor preparation.
When you install your vinyl on a wood subfloor the top plywood should be a minimum of 1 4 thick.
To do this measure and cut the plywood to fit your room.
Most lvp flooring is water resistant some types are even waterproof and it s also very durable able to resist dents dings scratches and stains.
Arrange the plywood on the first layer of wood.
Hard set adhesive is spread along the subfloor and then the vinyl planks are laid down on top.
I was told that we do not need any type of sub floor barrier and can lay directly onto the.
Our basement is all concrete presently.
If your concrete subfloor was just poured you ll need to allow it to properly cure for a minimum of 60 days before your luxury vinyl flooring installation begins.
They mimic hardwood yet offer the ease of maintenance of luxury vinyl.